-5%

Rheem Gas A26 Upgrade – Auckland only

Original price was: $1,850.00.Current price is: $1,750.00.  plus GST

Rheem Gas A26 Upgrade

Availability: 15 in stock SKU: gtxd6pftpm2b Categories: , ,

Description

Rheem Gas A26 Upgrade

This like-for-like changeover special includes:
  • Gas test on existing installation
  • Removal of existing unit
  • New Rheem A26 unit
  • New valves
  • Alter existing pipework to suit
  • Gas certificate

 

Excludes:
  • Electrical work if unit is hardwired
  • Installations on second floors

 


 

Only on when you need hot water. These continuous flow hot water systems for residential applications. These water heaters produce endless hot water, and unlike electric cylinders, are energy efficient as they are only on when you need hot water.

Installation Options:

Califont to califont replacement

  • Test existing gas installation is sound
  • Disconnect and remove existing unit
  • Supply and hang new unit
  • alter existing pipework to suit new unit
  • Installation of new isolation valves
  • Test and commission installation
  • Gas cert
  • Remove all associated rubbish from site

Existing Cylinder to Gas Continuous Flow LPG

  • Drain,disconnect and remove existing low pressure storage cylinder
  • Remove existing pipework and valves
  • Supply and hang new Continuous flow unit on external wall
  • Installation of limiting and line strainer valve on main water line in or under new hot water unit
  • Run hot and cold pipework from new unit and connect to existing pipework
  • Supply and installation of adjustable LPG auto changeover regulator and external copper piping and valves
  • Run new gas pipework from regulator to hot water unit
  • Electrical work to new external RCD power point
  • Electrical safety cert
  • Test and commission installation
  • Gas cert
  • Remove all associated rubbish from site

Existing Cylinder to Gas Continuous Flow Natural Gas

  • Drain,disconnect and remove existing low pressure storage cylinder
  • Remove existing pipework and valves
  • Supply and hang new Continuous flow unit on external wall
  • Installation of limiting and line strainer valve on main water line in or under new hot water unit
  • Run hot and cold pipework from new unit and connect to existing pipework
  • Installation of gas pipework from meter position to new hot water unit
  • Connect gas pipework to meter and hot water unit
  • Electrical work to new external RCD power point
  • Electrical safety cert
  • Test and commission installation
  • Gas cert
  • Remove all associated rubbish from site